Quote:
Originally Posted by Turtle
next comes cutting the mortises that receive the splines. 
|
with the work clamped to the table, mark the mortise edges with a butt-gauge, clamp a saw guide to the work, and saw the shoulders. using a 1/4" chisel, the waste is cleared and the mortise sized. repeat for remaining 7 joint faces.
(video is double-speed to spare you all the sawing.

)
----------------

semantics is not always just pedantic quibbling. ~ douglas r. hofstadter